Downtown Housing Incentive Program

Eligibility Guidelines


Project Location & Type

  • Create new multifamily housing units (rental or for-sale condos) within the Greater Downtown Urban Renewal District.
  • Be a rehabilitation of an existing structure.
  • Have clearly defined start and completion timelines.

Eligible Unit Types

  • Newly Created Units: Created in a portion of a structure never previously used as housing.
  • Rehabilitated Long-Vacant Units: A previously existing housing unit vacant for more than 3 years and undergoing full rehabilitation that corrects all code deficiencies and deterioration.

Rehabilitation Standards

  • Bring the structure into full compliance with the 2021 IPMC and 2021 IBC.
  • Correct all unsafe, unsanitary, damaged, or deteriorated conditions, including structural, electrical, mechanical, and plumbing systems.
  • Repair or replace components that are defective or beyond service life; cosmetic-only improvements do not qualify.
  • Meet all life-safety, egress, and habitability requirements.
  • Use durable, long-term residential materials.
  • Submit a comprehensive scope of work addressing all code corrections, subject to City approval.

Building Configuration

  • Units must generally be located above a first-floor commercial component.

Design Review Requirements

  • Reimbursement covers labor and materials that significantly improve appearance following City of Dubuque Architectural Guidelines or Downtown Design Guidelines, as applicable. Review the Design Guidelines
  • Existing noncompliant signage must be brought into compliance as part of the project.
  • A detailed rendering/drawing with dimensions, materials, and architectural details must be submitted.
  • Deviation from the approved plan may disqualify the project.

Additional City Requirements

  • City may require soundproofing, lighting, security, or other standards based on a neighborhood impact review.
  • Property owners must certify that all properties they own in Dubuque comply with all applicable City ordinances.

Funding Limits

  • Up to $10,000 per residential unit.
  • Up to $750,000 per taxing parcel.
  • No developer fee may be paid until all City assistance is fully disbursed.
  • Funds are disbursed after project completion and issuance of all Certificates of Occupancy/Completion.

Minimum Project Size

  • Projects must create at least 2 new housing units.

Application Review

  • Applications are reviewed when complete.
  • Funds are awarded to projects that meet all criteria and are ready to commence within 12 months.

Approval Process 

Applications will be reviewed by the Economic Development Department on a case-by-case basis with qualifying projects being submitted to the City Council for final review and approval.

Apply online or download an application.

Note: Printed applications should be e-mailed to EconDev@CityofDubuque.org or mailed to the Economic Development Department at 50 W. 13th Street, Dubuque, IA, 52001.

Having Trouble?

View instructions on submitting an online application

Find general FAQ's about the grant application process